December 10th
through December 16th: Monday I worked on finishing the duct for the dryer and wiring the
last of the can lights and plugs in the hall.
Mom went to lunch with an old high school friend. Tuesday
I framed around the duct work in our bedroom and finished all the wiring in
that room. Mom went to the dentist to see what she needs to have done. She had a tooth pulled in Guatemala and will
need at least one implant and a crown.
|
The ceiling is ready for sheet rock. |
Wednesday
I got all the loose ends done and my work is ready for the rough inspection. The plumber came and finished the pan for
the new shower and the drain for the washer so his work is ready also. Mom went into Salt Lake to Blomquist Hale,
where she is going to work as a therapist.
She met with the HR person who gave her a lot of material that she has
to read and sign. She has to have a
background check to see if she is a “shady” character. She did get finger-printed and we are relieved
she has no criminal record. In the
evening, we went to Badger, Moose and Ellie’s Christmas program at their school. It was fun to see them all perform.
|
Badger plays the trombone.
Click below to hear BadgerBadger playing the trombone
|
|
Ellie singing in the choir for her Christmas program. She is the blond in middle of the front row in the grey dress. |
Thursday morning the inspector came and
said I needed to do three more things before he could sign off and we can start
to hang sheet rock. So I went and
purchased 3 smoke detectors and a smoke/carbon dioxide detector and hard wired
them in the two bedrooms and halls. I
thought that they could be surface mounted and battery operated, but the code
says in new construction they have to be wired and in a series so if one goes
off the all go off. I had to lower the
ceiling in the new bathroom because of the dryer duct and the walls need some
fire blocking. The last thing is I need
to provide more combustible air for the furnace. This meant that I needed to cut a hole in the
brick and put a grill on it so air from outside can flow into the furnace
room. Thursday I got the hole in the
brick done. I called for a re-inspection,
but they don’t work on Friday so it is scheduled for next Monday. In the evening, we went to Evan’s Christmas
concert.
|
Evan's Christmas Concert |
|
Evan plays the violin. |
Friday we went to the temple and then did some shopping for counter
tops, tile and vinyl flooring. We think
we have found what we want to use. I
started cutting sheet rock in anticipation of getting approval on Monday to
start hanging sheet rock.
|
This is what we are thinking we will use. Vinyl planking for the floor, white cabinets, grey quartz counter-tops, and carrera marble with grey square tiles for the back splash. |
|
The washer and dryer will be stacked, so the dryer vent and gas line are up high. |
Mom took
Rigby, Stanford, Luke, Jake and Ellie to the play, “The Lion, the Witch and the
Wardrobe”.
|
Mom took our 4 eight-year-old grandsons to the play, "The Lion, the Witch and the Wardrobe." Left to right: Rigby, Stanford, Jake, and Luke. Ellie came along too. |
Saturday I got all the fire blocking done and all but 6 pieces of
sheet rock cut. I also took a load of
trash to the dump.
|
Truck loaded for the dump. |
|
Sheet rock is everywhere. |
|
Only a few pieces of sheet rock left to cut. |
Moose, age 13, made
the semi-finals in the cha-cha at his dance competition.
Click below to see Moose dancing.
Sunday
we went to church and Mom and I cooked a pot roast, potatoes and gravy and broccoli
dinner. That is the meal we had when our
children were small almost every Sunday.
It brought back a lot of memories.
|
Pot roast with mashed potatoes and gravy, Yum |
I got sustained as the Temple and Family History specialist in the
ward. We are starting to feel like we
are putting down some roots and that we will be here for awhile. Life is good and if we can just get into our
apartment things will be great. We are
very blessed.
1 comment:
Moose looks like a stud!!
Post a Comment