January 7th through January 13th: Monday the plumber came and set the toilet and
fixtures in Badger’s bathroom. He also
got the pan liner down in our shower.
Chris went to work and had her first full day of clients. I painted ceilings. We drove to American Fork in the evening and had a wonderful dinner and visit with our good friends Mike and Merlene Ellington. It was great to see them and so nice of them to drive up from Mount Pleasant to see us. Tuesday, I got up and went to my happy place,
Home Depot, and bought 4- 80 lbs bags of sand mix for the mortar bed in our
shower. Badger wasn’t feeling well and
had stayed home from school. I convinced
him to help me carry the bags down to the basement and to help me mix the
concrete. We did not have enough so we
used some concrete mix that I had left over from the repair of the concrete we
took out for the new plumbing in Badger’s bathroom.
|
This shower is more than twice as big as the last one. |
He was a big help and we got done about noon
and so I took him to lunch. I got
cleaned up and went for my orientation at the temple with the supervisor over
the sealers. I got my locker key and
will have my first shift on Saturday. In
the afternoon, I pulled the toilet in our bath and framed for the larger vanity
we need. Mom went to work in the evening
and came home after I was asleep.
|
Badger's new shower. Chris got the tile sealed. |
|
Floor grouted. |
Wednesday
I added two can lights in our bathroom and installed the bathroom accessories
in Badger’s bath-- towel bar, toilet paper holder, mirror and so on, including
the finish carpentry. Thursday I cut the hardi board for our shower and
installed the sheetrock in our bathroom.
We took Charlotte and Alex to lunch for Charlotte’s birthday. We also ended up going to dinner with their
family. Charlotte’s present to herself
is not to cook on her birthday.
|
Happy Birthday Charlotte |
|
Vanity, hardware and medicine cabinet installed in Badger's new bathroom. Doors to vanity will come later. |
Friday I
got the sheetrock taped and all the ceilings got their last coat of paint so I
installed all the lights in the 40 cans.
|
Sheet rock is up--vanity goes on the left, toilet on the right. |
|
Badger's new bathroom with the mouldings installed. |
|
We have plenty of light! |
Saturday John B. finished installing the Hardi board in our shower.
|
Our shower is ready for taping, waterproofing, and then tile. |
I went to the temple for my first sealing
shift. I really enjoyed being back in
the temple. We went to dinner with our
good friends, Paul and Liz Belnap, and
enjoyed catching up. I came home and did
finish carpentry until 11:00 pm. Being
at the temple must have given me added endurance. So I got my 10 hours of work in. Sunday we went to church and then we had a
great pot roast dinner. The apartment is
progressing, just not as fast as I would like.
We pushed back the delivery of our appliances two weeks and we hope we
will be ready now by the 4th of February. This next week I will concentrate on the
finish carpentry and the cabinets. Life
is good and we are very blessed.
2 comments:
And on Monday night we drove to American Fork and had a very good Chinese meal at TemptAsia with the Ellingtons. They really enjoyed seeing you and visiting with you.
You are right. It was great to see you.
Post a Comment