July 29th
through August 4th: Monday Chris went to work and I worked on installing the crown molding
in the music/craft room. I made a trip to Clearfield to pick up the new front
and back door and the moldings for the rollout trays (65) that I still have to
build. In the afternoon I installed the
tile floors in the new bath and laundry rooms.
|
Crown molding installed in music/craft room. |
|
Crown molding installed in music/craft room. |
|
Tiled installed. |
|
Tile in bath installed. |
Tuesday I installed the tile
for the floor of the
drain pan and the cut tiles around the toilet. In
the afternoon Chris went to work and I
installed the handrail and balusters for the
stairs.
|
Tile for the washer drain pan installed. |
|
Tile around the toilet installed. |
|
Handrail and balusters installed. |
Wednesday with Moose’s help we got all the sides and fronts and backs
for the rollout trays cut. I also
started the moldings for the bath and laundry room. In the afternoon the countertop guys came and
installed the quartz top for the kitchen.
|
Parts cut for the rollout trays. |
|
Counter tops installed. |
Thursday Mom went to work and
I got the new tile floors grouted and the moldings installed around the kitchen
window installed. In the afternoon I got
the wall cabinets for the bath and laundry rooms built. Mom took the train to American Fork and will
be tending James and Kirstin’s kids until Monday night.
|
Tile grouted. |
|
Bathroom tile grouted. |
Friday
I got the cabinets in the bath and laundry room installed with the help of Badger
and Moose. I was then able to install
the crown molding in those two rooms. Finally
all the moldings are installed. This
week John B. has been working before and after work on getting the caulking
done.
|
Cabinet and moldings installed in the powder room. |
|
Wall cabinet and moldings installed in laundry room. |
|
Window trimmed out in laundry room. |
Saturday John B. and I made a trip to the dump and with Moose’s help
we got most of the dados cut on the rollout tray parts. I was able to finish up some electrical,
installing a box and wiring for an outlet in the island and a switch for the
lights in the some of the cabinets in the music/craft room. I got the last 2 cabinets built and installed
in the laundry room.
|
Trip to the dump. |
In the afternoon I
got cleaned up and drove to American Fork and Chris and I celebrated our 46th
wedding anniversary by telling each other happy anniversary and going to the
wedding reception of the granddaughter of my brother, Tad, and sister-in-law,
Tove. It was a lovely affair and we saw a lot of family.
|
L to R Tove, Rachel, Austin, and Tad. |
I stayed over and helped tend our three
grandchildren. I fixed a hole in the
sheetrock where Campbell their youngest had slammed a door knob into the
wall.
|
Saturday evening walk with Campbell. |
|
Hole patched. |
Sunday we took the kids to church and then had dinner
together. We tried to take the kids to
the park but it was too hot. I then
drove back to our home in Bountiful, so I could get a full day of work in on
Monday.
|
Sunday breakfast of Swedish pancakes. |
I will drive down again Monday
evening to bring Chris home. We got a
lot done on the remodel and I can see light at the end of the tunnel. Next week we should be able to start painting
and then it is just install the vinyl floor, the cabinet doors, some hardware,
and finish electrical.