Ceiling textured. |
Wires pulled for new lights. |
It was a full load to the dump. |
Tuesday I got the ceilings painted and some new base boards
installed in the stair well. Wednesday I got two coats of paint on
the moldings. Thursday mom and I got the moldings taped off and a coat of paint
on the walls. Friday we got the second coat of paint on the walls. I got all the plugs and switches changed out
form beige to white. I got the new
lights installed in the stairwell. Mom
got the handrail painted. I installed
new shelves in Badger’s closet.
Badger's bedroom and the hall are ready for carpet. |
The stairwell is ready for carpet also. |
Saturday I got all the tools cleaned out
of the bedroom. I got the handrail
installed and we are now ready for the carpet to be installed on Monday. I also called for the inspector to come
Monday afternoon. If all goes well,
Badger will be able to move in on Tuesday.
Saturday mom drove to American Fork to watch Emme dance. She hurried back for our temple shift. After our temple shift, we went to the storage
shed and got another load of boxes.
Emme is a beautiful dancer. |
Mom and Emme. |
Sunday we enjoyed our church meetings
and being with John and Jill’s family. The
kids like to come down and see us and just hang out. In the evening John and Jill showed pictures
of their trip to Italy.
Sunday morning hanging out in our apartment. |