March 6th
through March 14th: It has
been hard to find time to write this blog.
I have been burning the candle at both ends. As you read you will get the idea. Thursday, March 6th, I was up
early and at the molding job at 7:00am.
I worked on the stairs and getting the base to die into the stair
skirts, so that things would look good and flow together well. I installed more base downstairs.
|
I had to make the stair skirts wider to flow into the new baseboards. |
I met Chris and Wally and Martha at Crown
Burger for dinner about 6:00pm and then we went to another lecture on the Dead
Sea Scrolls. This time it was a lecture
on the Isaiah scrolls. This professor
was on the international team of translators of the scrolls and boy did he love
Isaiah and his style of writing. Friday,
I had the pleasure of going to the endodontist and have surgery on a front
tooth that I was having problems with.
Turns out that he cut me open only to find a crack and that he could not
repair the 35 year old root canal. He
said it would have to come out and I would need a bridge or an implant. He sewed me up and said that will be 600
dollars. So I have 6 stitches, a sore
mouth, a lighter pocket book and still
have a tooth that needs to be fixed. It
is not bothering me and so we emailed Pres. Atkinson and he said many Americans
come to Oaxaca to get dental work done.
I think that is what we will do.
There is just not time to get it all done here before we leave. Saturday, I worked at Home Depot from
10:00am till 5:30pm. Sunday, we asked
our Sunday school class to sing a song on the Sunday in April that we
talk. They said they would. I had to work in the afternoon. Monday, I got up at 6:00am and went and
looked at patio doors at the Home Depot in Salt Lake. They had one door left that would fit the
door at the Rigby’s. So I bought it and
had it delivered. I then went and finished
installing the bathroom floor and base for Brother Pascoe in our ward. I then went to work at Home Depot and
finished up at 6:00pm. Tuesday, I got up
early and was at Home Depot by 6:00am buying wood for the jambs and casings for
5 windows that got added to the molding job.
I then went to John’s house to rip the sills. I made it to the job site a little after
7:00am. I worked on the sills for the
windows and then started the door. I had
some real problems getting a plate milled and installed into the 60 year old
concrete. But finally I got the door
installed except for the casing and hardware.
I finished up about 7:00pm.
|
The new patio door downstairs. |
Wednesday, I got to work early again. Chris dropped me off about 7:30am
and then she went to a substituting job at Edison Elementary. I got the windows cased and finished the
door. Everything downstairs is installed
and ready for sanding.
|
Some of the windows that got added. |
|
New base boards and casings. |
Mom came and
picked me up about 6:30 pm. Thursday,
mom dropped me at 7:00am and she went to East High for another sub job. I sanded for 5 hours straight and got the
basement sanded. It makes such a mess
that we are going to wait to start the painting until all the sanding is done. Mom picked me up at 1:00pm and I went
straight to the shower when I got home.
I was covered in dust.
|
I wore a mask to sand but everything else was white. |
We had lunch together and then I went to
work. I got off an hour early at 9:00pm
because I have to be back at work at 5:00am.
Friday, I got up at 4:30am and went to work at Home Depot and worked
until 12:30pm. Then I went to the molding
job and got all the nail holes filled upstairs.
The upstairs is ready for sanding.
I will tackle that on Tuesday.
|
New base boards and casings. |
Mom had a sub job at Meadowlark
Elementary. I came home at 5:00pm and mom is at John’s tending and I am writing
this blog and tending Tilda and the 3 boys while Charlotte and Alex goes to the
store. 8 weeks to go. Can’t wait.
|
The best part of any day. |
1 comment:
Going on your mission will be like a vacation after the work that you two are presently doing. You make me tired.
Post a Comment